Wairarapa Line Capacity Upgrades

GIS, Rail Corridor Modelling, Automation

Hundreds of corridor cross-sections produced from the model rather than drafted, and regenerated every time the design moved, on a model-first KiwiRail level crossing programme between Upper Hutt and Masterton.

Drawing title
Sheet 01-05
Organisation
Aurecon
Client
KiwiRail
Role
Digital Engineer
Year
2023
Location
Greater Wellington, New Zealand
Sector
Rail
Status
Complete
Built with
GIS, Rhino, Grasshopper

Background

The KiwiRail Wellington Metro Upgrade Program 6B covers upgrades to the Wairarapa line between Upper Hutt and Masterton, focused on improving pedestrian and vehicular interfaces at level crossings. The client emphasised innovative digital delivery and a model-first approach.

The problem

A corridor-length programme of level crossing works generates hundreds of cross-section drawings. Producing those by hand is slow, and every alignment or design change invalidates the set.

What I built

Level crossing assets were modelled with attribution preserved so the models could be analysed rather than just viewed. The project GIS portal was set up and managed as the place all project data was collated and presented. Cross-section production along the rail corridor was automated, working closely with the client and contractors to model and visualise the route.

Outcome

Hundreds of cross-sections produced from the model rather than drafted, and regenerated as the design moved. The portal gave client and contractor a single view of the corridor data.